Press lines and the G1 plan
Equipment running today
The Bam factory is introduced with three production lines, 18 presses and about 5,400 tonnes of press capacity. These figures describe the equipment already stated on the site.
Three lines, 18 presses and about 5,400 tonnes are the published scale of the Bam factory. They do not replace an engineering review of one specific part.
The G1 development plan
The company vision names development of the G1 press line, with an integrated press system and automation, as the route to more capacity. This site has no separate published specification for a line named G2, so this page does not invent one.
G1 is the capacity plan in the company vision: an integrated press and automation. No separate specification is published for a line named G2, so none is invented here.
Which line runs a part
Which line runs a part depends on sheet grade, size, draw depth and volume, and is decided in the engineering enquiry.
Sheet grade, size, draw depth and volume decide whether a part fits a line. That decision is written in the reply to the enquiry, after the drawing arrives.